Earthworks · Site cuts

Site cuts. Level, square, ready.

Cut to engineer level for shed, garage or house slabs. Sub-base in, set out pegged, ready for the next trade.

What's included

Cut, base, peg, hand off.

Site cut sounds simple. But get the level wrong and the slab wears the cost. We cut to drawings, not eyeball.

  • Set-out + cut. Pegs to engineer level, cut to depth. Spoil stacked or tipped depending on quote.
  • Tight-access machines. 1.7t and 3t excavators for 1m+ side gates. Hand work where the gate's tighter.
  • Sub-base in. Crushed rock, compacted, levels confirmed.
  • Tip fees included. Spoil priced into the quote. Not at the end.
  • Hand-off to concrete crew. Same mob ready to pour. Or hand-off to your builder.
Mickleham · Pad cut
How we work

Four steps. Most pads done in a day.

01

Plans + access

Engineer drawings if available. Side-gate width either way.

02

Set out + cut

Pegs in, machine in. Cut to level, spoil out.

03

Sub-base + compact

Crushed rock in, watered, rolled. Levels confirmed.

04

Hand off

Pad ready, photos sent. Concrete crew (us or yours) takes it from here.

Site cut quote

Photos + plan = quick number back.

Pad size, depth (if you know), side gate width, any access notes.