The bit nobody sees once the slab goes down. But the bit that decides whether the slab cracks in two summers. Cut to level, sub-base compacted, ready for the pour.
If the sub-base is soft or unlevel, the slab cracks. We compact it, level it, and confirm before the formwork goes on.
Plans if you've got them, side-gate width either way.
Pegs in, cut to level, spoil out.
Crushed rock in, water, rolled, levels confirmed.
Formwork built, vapour barrier in. Concrete crew can pour next day.